Utility companies requiring to occupy the Town's right-of-way to complete work on utility infrastructure will need to apply for a Utility Road Occupancy Permit (ROP).
Please note that payment and submission of an ROP application is not considered a valid permit. The Town will reach out to you to provide a valid permit upon satisfactory review of the permit application.
Prior to starting your ROP application, please ensure you have the following documents:
- A copy of an up to date WSIB Clearance Certificate.
- A copy of your Certificate of Insurance (The Town requires a minimum of $5,000,000.00 in General Liability and the Town must be listed as additionally insured.
- Approved Municipal Consent (if applicable).
- A drawing/ sketch of the proposed works.
- A Traffic Control Plan (TCP).
- A photo of the work area showing pre-existing conditions.
- A Restoration Plan
Municipal Consent
What is Municipal Consent?
A Municipal Consent is a process that allows Utility Companies to engage the Town for the location approval to install new infrastructure, complete major upgrades, and/or complete repairs to existing infrastructure within the Town's owned right-of-way.
How to apply for Municipal Consent
To submit a Municipal Consent application, applicants must submit a cover letter stating the date, contact person, contact information, company name, company address, company project number(s) (if applicable), identify the location of the proposed work, a detailed description of the proposed work and applicable drawings detailing the proposed works.
Applications must be submitted to the Town a minimum of 30 business days prior to the planned start date of the work.
Applications can be sent to the following email address: roadpermits@townofbwg.com. The Municipal Consent applications will be reviewed by the Town's Transportation Department.
Apply for a Road Occupancy Permit for Utility Works