Engineering Studies and Environmental Assessments

Learn more about the ongoing Engineering Studies and Environmental Assessments happening in BWG. Please visit our Completed Projects page for information on recently completed projects.

Rain water going into sewer drain

Inflow and Infiltration Study

This project includes a review and analysis of the Town's entire wastewater network. 

Holland Street East, looking east

TMP: Support Growth to 2031

This study looks into BWG's future in terms of population, commuter needs, and more.

Holland Street East, looking east

Holland Street East and West Corridor

This project will transform Holland Street to align with the Town’s Strategic Plan.

Engineering drawing showing improvements for Line 8/Barrie Street intersection

Line 8 Environmental Assessment

The project includes the assessment of several options to address increasing traffic on Line 8.

Community and Traffic Safety

Traffic Mitigation Strategy

The traffic mitigation strategy will address existing traffic concerns and support safer streets in BWG.

arial image of the Bradford water pollution control plant

Water Pollution Control Plant (WPCP) Tertiary Upgrade

The Town of BWG completed an Addendum to the 2012 Bradford Water Pollution Control Environmental Study Report.  