We will no longer be supporting IE7 and below as a web browser effective June 1st 2020. Click here for more information.

Sign In

Bradford West Gwillimbury

Skip Navigation LinksBradford West Gwillimbury > Bradford Water Pollution Control Plant (WPCP) Upgrades Project

​​​​​​​​​​​Bradford Water Pollution Control Plant (WPCP) Upgrades Project 

Description:

The objective of the Bradford Water Pollution Control Plant (WPCP) upgrades projects is to address the plant's operational requirements.  This will ensure that there is adequate wastewater treatment capacity to service growth to 2031.  The project consists of three phases.

Project Phase 1: WPCP Reviews and Upgrades Project

Plant state of good repair analysis, process optimization study and upgrades validation.  Design and construction for upgrades to the plant headworks building, chemical/ odour control systems and a new sludge thickening system.

Project Phase 2: WPCP Tertiary Treatment System Upgrades Project

Design and construction for plant tertiary treatment system upgrades.

Project Phase 3: WPCP Optimization and State of Good Repair Analysis Upgrades Project

Design and construction for projects recommended by the plant process optimization and state of good repair analyses. 

Project Status and Update (Key Dates):

  • Project Phase 1- WPCP Reviews and Upgrades Project:                                                                           Reviews 2020; Design 2020 – 2022; Construction 2021– 2023
  • Project Phase 2 - WPCP Tertiary Treatment System Upgrades Project:                                                      
     Design 2020 – 2022; Construction 2022– 2025                                                               
  • Project Phase 3 - WPCP Optimization and State of Good Repair Analysis Upgrades Project:                Design 2021 – 2022; Construction 2022 – 2024