Skip Navigation LinksBradford West Gwillimbury > Bradford Water Pollution Control Plant (WPCP) Upgrades Project

​​​​​​Bradford Water Pollution Control Plant (WPCP) Upgrades Project 

Description:

The objective of the Bradford WPCP upgrades projects is to address the plant's operational requirements.  This will ensure that there is adequate wastewater treatment capacity to service growth to 2031.  The project consists of three phases.

Project Phase 1: Bradford WPCP Reviews and Upgrades Project

Plant state of good repair analysis, process optimization study and upgrades validation.  Design and construction for upgrades to the plant headworks building, chemical/ odour control systems and a new sludge thickening system.

Project Phase 2: Tertiary Treatment System Upgrades

Design and construction for plant tertiary treatment system upgrades.

Project Phase 3: PLant Optimization and State of Good Repair Analysis Upgrades

Design and construction for projects recommended by the plant process optimization and state of good repair analyses. 

Project Status and Update (Key Dates):

  • Project Phase 1- Bradford WPCP Reviews and Upgrades Project:                                                                    Reviews 2020; Design 2020 – 2022; Construction 2021– 2023
  • Project Phase 2 - Tertiary Treatment System Upgrades:                                                      
    Design 2020 – 2022; Construction 2022– 2024                                                               
  • Project Phase 3 - WPCP Process Optimization and SOGR Analyses Recommendations Upgrades:              Design 2021 – 2022; Construction 2022 – 2024