Background
As part of the Town’s ongoing culvert and bridge inspection program, McArthur Bridge located on Line 4 has been identified as needing replacement.
Through a public Request for Proposal process the Town has retained The Ainley Group as the consulting engineer to design the replacement of these culverts.
Project Status
The project is currently in the design phase which is expected to be complete by the end of 2025.
Construction is anticipated to begin in 2026