We will no longer be supporting IE7 and below as a web browser effective June 1st 2020. Click here for more information.

Sign In

Bradford West Gwillimbury

Skip Navigation LinksBradford West Gwillimbury > Town Services > Construction & Capital Projects

​Bradford Security of Water Supply Project

Description:

These projects will unlock water supply capacity, and in doing so, allow Bradford to continue to grow. 

The SWS projects will;

  • Reduce the system constraints;
  • Increase system robustness, and;
  • Mitigate system risks.

The goal of these measures is to ensure Bradford has the water supply to service its population growth to 2031.

Project Status & Update:

SWS Project 1: Water System Optimization & State of Good Repair Study                

This project will begin with an evaluation of the existing water supply, storage and transmission system.  This project will then recommend repairs, upgrades, and improvements necessary to reduce constraints and increase the robustness of the water system. 

​Key Dates:
System Evaluation & ReviewsQ2/Q3 2020
Detailed Designtbd
​Construction Starttbd
Construction Completiontbd

SWS Project 2: Water Wells Emergency Backup Power

This project will increase system robustness.  This project will provide backup power at the Church Wells site in the event of a power loss or brownout.    

Key Dates:
Environmental Assessmenttbd
Detailed Design2020
​Construction Start2021
Construction Completiontbd

SWS Project 3: Noble Drive Standpipe Refurbishment

The project will refurbish and extend the useful life of the Noble Dr. Standpipe (Bradford Standpipe No.2).  

Key Dates:
Environmental Assessmenttbd
Detailed Design2020
​Construction Start2021
Construction Completiontbd


​​