We will no longer be supporting IE7 and below as a web browser effective June 1st 2020. Click here for more information.

Sign In

Bradford West Gwillimbury

Bradford West Gwillimbury > Town Services > Construction & Capital Projects

​​​​​​​​​​​​​​​​​Capital Projects & Con​struction​

The Town of Bradford West Gwillimbury manages its infrastructure and assets - including roads, sewers, watermains and pumping stations - to ensure that reliable service is provided to businesses and residents.

This means that the Town must occasionally undertake to rehabilitate or replace aging water, wastewater and storm water infrastructure, as w​​ell as bridges and roadways un​der the Town’s control. Generally, this is done by prioritizing projects on the basis of need and ensuring that replacement work is coordinated to minimize disruption​s.
​​​
 

Pick a project for more details:

​Road Construction &
Infrastructure Replacement
​Water​/Wast​ewater
​Engineering Studies &
Environment​al Assessments​
​​South West Arterial Road (SWAR)​​
Bond Head Servicing
Line 8 Environmental Assessment
Parking Lot A (John and Moore St)
​​​Bradford Water Pollution Control Plant
​Holland St Servicing Study
Sideroad 10 and Line 8 Improvements
Bond Head Sanitary Pumping Station
Transportation Master Plan
​​​Urban Roads Rehabilitation:
- SW Quadrant (Collings, Maplegrove)​​​
Bradford Security of Water Supply Project
Bradford Urban Area Inflow and Infiltration Study
​​​2020/2021 Urban Roads


​​COMPLETE​

Highway 400/Line 5 Interchange​​
​​Line 8 Watermain​​

​​​Urban Roads Rehabilitation:
NE Quadrant (Scanlon, Nelson, Lee)
NW Quadrant (Frederick, Moore)
SE Quadrant (Sc​anlon, Back, Buce)
Bond Head Water Tower​​

OPA 15/16 Servicing
​​
Hwy 400 Sanitary Pumping Station
​​​