Holland Street Servicing Study
Description:
This study is evaluating the Town’s existing infrastructure along the Holland Street corridor between Professor Day Drive and Bridge Street, as well as the area along Dissette Street between Bridge Street and 225 Dissette St. This evaluation will allow for the planning and design of new infrastructure required to service new development in this area.
Project Status & Update:
This assignment was started in November of 2020 and is ongoing with anticipated completion in December of 2021.
Contract Services:
- Study and Preliminary Design Service by Tatham Engineering
Environmental Assessment | 2021
|
Detailed Design | tbd
|
Construction Start | tbd
|
Construction Completion | tbd
|
Background:
The new OPA27 requires a significant densification within the study area including the development of multi-story buildings that will house a combination of commercial and residential space. This new development will require additional water and sanitary servicing capacity and the study will give the Town an indication of how best to implement the increased requirements while minimizing impacts to existing businesses and residents along the two corridors.