Description:

This project is for a new watermain trunk line to connect Bradford with Bond Head along Line 8 from Sideroad 10 to County Road 27. The watermain is also to continue south along Sideroad 5 and County Road 27 to County Road 88. Full-depth road reconstruction is also planned along Line 8 between Sideroad 10 and Highway 400.​

(click thumbnail at right for larger image)

Project Status & Update:

Installation of watermains on County Road 27, Sideroad 5 and the portion of Line 8 between these two roads is largely complete. The watermain that will run underneath Highway 400 is now in progress.

Work on Line 8 east of Highway 400 is underway, including full depth road construction of Line 8 with replacement of a bridge structure and culverts. Rolling road closures will be required on Line 8 during this work.

Contract Services:

  • Construction: Trisan Construction
  • Contract Administration and Construction Inspection: MMM Group Limited
Key Dates:
​Project Initiation​​​​June 2014
Project CompletionOctober 2017