Sign In

Bradford West Gwillimbury

Skip Navigation LinksBradford West Gwillimbury > Town Services

​​​​​​​​​​​​​​​​​Capital Projects & Con​struction​


Visit the NOTICES page for ALL construction, roadwork and service disruption notices.​

The Town of Bradford West Gwillimbury manages its infrastructure and assets - including roads, sewers, watermains and pumping stations - to ensure that reliable service is provided to businesses and residents.

This means that the Town must occasionally undertake to rehabilitate or replace aging water, wastewater and storm water infrastructure, as w​​ell as bridges and roadways un​der the Town’s control. Generally, this is done by prioritizing projects on the basis of need and ensuring that replacement work is coordinated to minimize disruption​s.
​​​
​RURAL
Road Replacement

Pick a project for more details:

​Road Construction &
Infrastructure Replacement
​Water​/Wast​ewater
​Engineering Studies &
Environment​al Assessments​
​2017 Urban Road Rehabilitation Bond Head Water Tower
Line 8 Environmental Assessment
Frederick/Joseph/Moore Reconstruction Bradford-Innisfil Transmission Main
Highway 400/Line 5 Interchange
Line 8 Watermain
Holland Street Reconstruction OPA 15/16 Servicing
Newton Robinson Bridge Reconstruction​​
Wastewater Pollution Control Plant
Sc​anlon/Back/Buce/Rebecca/Townsend Reconstruction​​
Simcoe Road Urbanization
South East Arterial Road (SEAR)
South West Arterial Road (SWAR)

Completed Projects​ ​ ​
​​Line 6/Walker Ave UrbanizationGreen Valley Sanitary Pumping Station​​Roads Needs Study
Mary/Drury Parking LotMiddletown Sanitary Pumping Station​Stormwater Management Plan
Melbourne Dr Widening

​​​