Sign In

Bradford West Gwillimbury

Skip Navigation LinksBradford West Gwillimbury > Town Services > Development & Engineering > Capital Projects

​Capital Projects & Con​struction​

The Town of Bradford West Gwillimbury manages its infrastructure and assets - including roads, sewers, watermains and pumping stations - to ensure that reliable service is provided to businesses and residents.

This means that the Town must occasionally undertake to rehabilitate or replace aging water, wastewater and storm water infrastructure, as w​​ell as bridges and roadways un​der the Town’s control. Generally, this is done by prioritizing projects on the basis of need and ensuring that replacement work is coordinated to minimize disruption​s.
​​​

Pick a project for more details:

​Road Construction &
Infrastructure Replacement
​Water​/Wast​ewater
​Engineering Studies &
Environment​al Assessments​
Highway 400/Line 5 Interchange
Bond Head Water Tower
Line 8 Environmental Assessment
Holland Street Reconstruction
Bradford-Innisfil Transmission Main Stormwater Management Plan
Marshview Blvd (SEAR)
Line 8 Watermain
Newton Robinson Bridge Reconstruction​​
OPA 15/16 Servicing
South West Arterial Road (SWAR)
Wastewater Pollution Control Plant
Urban Roads Rehabilitation:
- ​NE Quadrant (Scanlon, Nelson, Lee)
- NW Quadrant (Frederick, Moore)
- SE Quadrant (Sc​anlon, Back, Buce)
- SW Quadrant (Collings, Maplegrove)

Completed Projects​ ​ ​
​​Line 6/Walker Ave UrbanizationGreen Valley Sanitary Pumping Station​​Roads Needs Study
Mary/Drury Parking LotMiddletown Sanitary Pumping Station
Melbourne Dr Widening
Simcoe Road Urbanization

​​​